• Price/Package: US $9.73 YOUR PRICES
  • Bronze Price:

    US $9.44

    3%off
  • Silver Price:

    US $9.15

    6%off
  • Gold Price:

    US $8.85

    9%off
  • Diamond Price:

    US $8.56

    12%off
  • Crown Price:

    US $8.27

    15%off
  • 3 Days
    Click to learn
    Shipping Weight: 1,000(g)
  • Pay with your Visa credit card Learn more

    Pay with your Mastercard Learn more

    Pay by Paypal Learn more

    Bank Transfer Learn more

  • Ask a Question

    Dyed Natural Long Oval Wood Beads, Oval/Oblong, Lead Free, Mixed Color, 23x8~9mm, Hole: 2.5mm, about 2000pcs/1000g(WOOD-Q003-23x8mm-M-LF)

    *Category:

    Please select a category.

    Comments:

    Please input your request.

    I Want Smaller Lots

    Dyed Natural Long Oval Wood Beads, Oval/Oblong, Lead Free, Mixed Color, 23x8~9mm, Hole: 2.5mm, about 2000pcs/1000g(WOOD-Q003-23x8mm-M-LF)

    Original Packing

    • QTY : Package
    • Package Size : g/package
    g

    Invalid Input

    I Want Mixed Products

    Dyed Natural Long Oval Wood Beads, Oval/Oblong, Lead Free, Mixed Color, 23x8~9mm, Hole: 2.5mm, about 2000pcs/1000g(WOOD-Q003-23x8mm-M-LF)

    Comments: Please input your mixed request.

    • Item Code: Please input the item code.

      Comments: Please input your mixed request.

    + Add Mixed Products

Product Description

Please Note: Due to stock variety, color or shape of mixed products may vary from photo sample shown on our website.

Dyed Natural Long Oval Wood Beads, Oval/Oblong, Lead Free, Mixed Color

Size: about 23mm long, 8~9mm wide, Hole: 2.5mm; about 2000pcs/1000g.

Priced per 1,000 g

Please Note: The color may be slightly different from the picture because of different display device.

Specification Size Info

Size 23x8~9mm, Hole: 2.5mm, about 2000pcs/1000g
Material Maple Wood
Color Mixed Color
Shape Oval
Usage Beads
Package Size 1,000 g per package

Customer Reviews

  • 5 Star
  • 4 Star
  • 3 Star
  • 2 Star
  • 1 Star
  • 100%
  • 0%
  • 0%
  • 0%
  • 0%

Average Star Rating: (1 vote)

Share your thoughts with other customers and get beadpark points.

Lovely!!

By Ev***n 2022-02-05 23:02

I just received these in the mail. The shipment came quickly. These are absolutely beautiful.

Customer Questions

Confirm

Please Note

OK

Please Note

OK

Search by Image

·Search kbeads with an image instead of text. Try dragging an image here.

  • 1. The image must be in one of the following formats: .jpg, .png, .jpeg, .bmp, .gif, .webp, .tiff, .ppm
    2. The size of the image should be less than 5M!
    3. The image length and width must be greater than or equal 200 pixels and smaller than or equal to 1024pixes.
  • 1. The image must be in one of the following formats: .jpg, .png, .jpeg, .bmp, .gif, .webp, .tiff, .ppm
    2. The size of the image should be less than 5M!
    3. The image length and width must be greater than or equal 200 pixels and smaller than or equal to 1024pixes.

Uploading File