- 0
- 0
- Days
- 0
- 0
- :
- 0
- 0
- :
- 0
- 0
Dyed Natural Wood Beads, Egg Shaped Rugby Wood Beads, Oval/Oblong, Lead Free, Green
Size: about 6mm long, 4~5mm wide, Hole: 2mm; about 22000pcs/1000g.
Priced per 1,000 g
Please Note: The color may be slightly different from the picture because of different display device.
Size | 6x4~5mm, Hole: 2mm, about 22000pcs/1000g |
Material | Maple Wood |
Color | Green |
Shape | Oval |
Usage | Beads |
Package Size | 1,000 g per package |
Share your thoughts with other customers and get beadpark points.
Search by Image
·Search kbeads with an image instead of text. Try dragging an image here.
Uploading File